| | | | Cassini: The Evolution of a New Breed of ATE (1/5) | | 06/02/2011 by Ryan Benech | 3.0.1 | | |
| | | | RI Software: The State-Based Approach(2/5) | | 06/02/2011 by Ryan Benech | 3.0.3 | | |
| | | | RI Synapse: Automated Test Plan Optimization (3/5) | | 06/02/2011 by Ryan Benech | 3.0.3 | | |
| | | | Guru: Building Bridges to Islands of Automation (4/5) | | 06/02/2011 by Ryan Benech | 3.0.4 | | |
| | | | Workflow Structure: Putting it all Together (5/5) | | 06/02/2011 by Ryan Benech | 3.0.5 | | |
| | | | Cassini Test Fixture and DIB: Assigning ESN to a Definition | | 02/15/2023 by Ryan Benech | 3.0.6 | | |
|
| CH 1: Basic System Operation |
| |
|
| CH 2: System Administration, Maintenance and Verify |
| |
|
| CH 3: Basic Test Plan Concepts |
| |
|
| CH 4: Science of RF Measurement |
| |
|
| CH 6: Example Applications Development |
| |
|
| CH 7: Test Fixture and Device Interface Design |
| |
|
| CH 8: Test Design & Best Practice Test Optimization |
| |
|
| CH 9: Application User Guides |
| |
| Cassini Basic Training (Future) |
| |
| Cassini Maintenance Manual |
| |
| Cassini Testplan Examples |
| |
| Cassini Operator Training |
| |
| Cassini Administration Manual |
| |