- Review this checklist completely before starting.
- Keep all boxes and packing material labeled with Do Not Discard to safely return items to the factory for calibration or service.
- See V93K Site Prep Guidelines for details on what is provided by RI and what is expected on site.
Open Document and White "RI" Envelope
- Review Completed Packing List (with instrument serial numbers) compare with actual and report any discrepancies immediately to [email protected].
- Apply "Calibration Sticker" to visible location on V93K Infrastructure
Setup Hardware
- Unpack Cart
- Unpack V93K Infrastructure and place on the Cart
- Unpack and Attach TIMs to V93K Infrastructure
- Unpack and Diag Kit (Case)
- Follow the Cassini V93K CTH Infrastructure Saftey Information https://roos.com/docs/TDOO-DH6RAZ
- Follow System Startup Procedure (See ADVANTEST documentation)
Run Diagnostics
- Follow the
Cassini V93K CTH Infrastructure Diagnose Procedure https://roos.com/docs/RBEH-DJ2QPX?Open
IMPORTANT: Wait at least 2 hour warm up period from first unpack or 10 mins from room temperature for the internal temperature of instruments to stabilize.